A step before design the system configuration would be trial of the media to find d optimum configuration to extend the retention time.
Hence, there's an arrangement with lab technician at 10:40pm at Mechanical Lab.
The trimming method wasn't easy as the tyres consist of rubber and steel bar in between. Its size is not suitable for super cutter.
Hence it was cut manually.
D cutting process wasn't nice.
Alot smoke generated as the tyres heat up and burned.
The debris flew and burned my skin at 1st as i didn't have experience handle the cutter.

My pity CK shoes @_*D process was terrible but i didn't give up as it's my dream. I havta b patient as this is the 1st challenge and I'll grow and face another challenge soon which is the design part.
Although I'm busy with Greencamp I'll follow my schedule as promised.
filled with smoke and burned tyres debris.